Shipping

Ocean Freight Guide: Costs, Documentation, and Transit

How ocean freight actually works — container economics, the document set, carrier liability caps, and the risk points between booking and delivery.

K. Somsak Chaivichit Updated June 10, 2026 10 min read
SC

K. Somsak Chaivichit

Head of Marine & Cargo Insurance

18 years structuring marine cargo and trade insurance programs for exporters, importers, and freight forwarders across ASEAN and beyond.

ACII — Chartered Insurance Institute18 years in marine underwritingThai Insurance Institute faculty

Short answer

Ocean freight moves goods in containers on scheduled liner services, priced as FCL (full container load, flat rate per container) or LCL (less than container load, rate per cubic meter). A standard shipment requires a booking, bill of lading, commercial invoice, packing list, and customs declarations at both ends. Transit runs 14–35 days on major lanes, and carrier liability is capped by convention — making separate cargo insurance essential for full-value protection.

FCL vs. LCL: The First Decision

DimensionFCL (Full Container Load)LCL (Less than Container Load)
SpaceEntire container — 20ft (~28 m³) or 40ft (~58 m³)Shared container space, rated per m³
PricingFlat rate per containerPer m³ or per ton, whichever is greater
HandlingSealed at origin, opened at destinationConsolidated and deconsolidated at CFS warehouses
Risk profileLower — fewer touchpointsHigher — co-loaded cargo, extra handling
EconomicsCheaper per unit above ~15 m³Cheaper for small shipments despite higher unit rate

The breakeven typically falls around 15 cubic meters: below it, LCL's per-m³ pricing beats an underfilled container; above it, FCL's flat rate wins on both cost and risk. Shippers in the middle zone should compare landed cost including CFS handling charges, which LCL quotes often understate.

What Ocean Freight Actually Costs

  • Base ocean freight — the port-to-port carriage rate, volatile with fuel, capacity, and season
  • Terminal handling charges (THC) — origin and destination container handling
  • Documentation fees — bill of lading issuance, amendments, telex release
  • Bunker adjustment factor (BAF) and currency adjustment factor (CAF) surcharges
  • CFS charges for LCL consolidation and deconsolidation
  • Demurrage and detention — container storage beyond free days, the most common surprise cost
  • Inland haulage — drayage between ports and warehouses at both ends

The Ocean Freight Document Set

  1. 1Booking confirmation — space allocation on a specific vessel/voyage
  2. 2Bill of lading (B/L) — receipt, contract of carriage, and document of title; issued as original negotiable set, seaway bill, or telex release depending on payment structure
  3. 3Commercial invoice and packing list — value and contents declarations
  4. 4Shipping instructions (SI) — the shipper's data feed into the B/L draft
  5. 5Verified Gross Mass (VGM) declaration — mandatory container weight certification under SOLAS
  6. 6Export and import customs declarations at respective ends
  7. 7Certificate of origin, insurance certificate, and inspection certificates as required by contract or destination regulation

The B/L's three functions explain why it dominates trade documentation: it proves the carrier received the goods, evidences the carriage contract, and — in negotiable form — controls who can claim delivery. Payment structures (LCs, collections) revolve around B/L possession for exactly this reason.

Where Cargo Loss Actually Happens

  • Container stuffing — improper loading, inadequate securing, weight miscalculation
  • Yard and terminal handling — crane drops, chassis accidents, stack collapses
  • Heavy weather — container loss overboard, water ingress through damaged units
  • Condensation — 'container rain' from temperature swings on susceptible cargo
  • Theft and pilferage — port areas and inland transit points
  • Co-loading risk in LCL — adjacent cargo damage and contamination

Carrier liability for these events is capped at roughly 2 SDR per kilogram under Hague-Visby — a fraction of commercial value for most cargo — and several (condensation, some theft scenarios) involve no carrier fault at all. This arithmetic is why cargo insurance is treated as mandatory infrastructure by experienced shippers rather than an optional add-on.

Transit Times and Schedule Reliability

Published transit times are port-to-port estimates; schedule reliability on major lanes historically runs 50–80% on-time performance, meaning buffer planning matters more than schedule optimism. Add customs clearance (1–3 days routine), inland transport, and documentation lead time to any vessel ETA when promising delivery dates downstream.

For time-critical cargo, the ocean-versus-air decision reduces to inventory economics: sea freight's per-kilogram cost advantage must exceed air's carrying-cost savings across the 3–4 week transit differential. High-value, low-weight goods fly; dense, lower-value goods sail.

Key takeaways

  • FCL beats LCL on cost and risk above ~15 m³; below it, LCL wins despite higher unit rates.
  • Demurrage and detention are the most common surprise costs — prepare documents before vessel arrival.
  • The bill of lading is receipt, contract, and title document — payment structures revolve around it.
  • Carrier liability caps at ~2 SDR/kg under Hague-Visby; cargo insurance fills the gap.
  • Schedule reliability of 50–80% means buffer planning beats schedule optimism.

Frequently asked questions

Port-to-port: 28–35 days to Northern Europe, 14–18 days to the US West Coast, 25–30 days to the US East Coast. Door-to-door adds 5–10 days for customs and inland movement at each end.

Share

Related services

Join the discussion

Questions about how this applies to your shipment or transaction? Our specialists read every inquiry.

Ask a specialist

Trade Briefing

Monthly insights on insurance, escrow, verification, and trade regulation. No noise.

Related articles

Put this knowledge to work

Our specialists structure insurance, escrow, and verification programs around your exact trade lane and counterparty risk. Get a tailored recommendation in one conversation.